Tagged: civil engineering

How Fast can the MBTA Go? The Future of Rapid Transit in Boston

The massive snows of 2015 have long since melted, but they did leave behind one, positive, long-term effect. The MBTA is finally getting the attention, and funding, it needs to bring existing rapid transit, trolley and commuter rail systems up to a “state of good repair.” As a result, a lengthy list of deferred maintenance will be addressed over the next several years, and the long-delayed Green Line extension to Somerville, 30-years in the making, is now fully under construction, with completion scheduled for 2022. Progress comes slowly with major transportation infrastructure in the Boston area. Continue reading