April 4: Consigli will be installing windows on the east stairwell of Beatty Hall and removing the windows on the south stairwell.

April 4  – April 5: Consigli will be installing roof protection on the northern part of Beatty Hall.

April 4 – April 8: Consigli will be installing windows on the south stairwell of Beatty Hall.

April 5-  April 8: Consigli will be removing windows on the Tansey Gym Side of Beatty Hall.

April 6 – April 8: Consigli will be installing windows on the Tansey Gym Side of Beatty Hall.

Please pardon the noise in the library as we go through this process. Earplugs are available next to the reference desk.